Project :

The short execution period of this football stadium required efficient solutions in products (formworks and shoring systems) as well as in the supply, since construction needed to be finalized within 6 months, coinciding with the beginning of the season.

 

The work was carried out in two phases. In the first, 1,000 new VIP seats were executed, along with a tower with stairs and an elevator.  The second consisted of a new structure in the southern area, with additional seats for approximately 13,000 spectators and various halls.  With these actions, this new stadium has a capacity of up to 54,000 people.

 

The MEGAFORM formwork allowed to execute the numerous rectangular columns and walls in a profitable manner, since it adapts to any configuration, as well as providing an excellent fair-faced concrete finish.

 