Project :

It is one of the largest construction projects to be carried out in recent years in North Rhine-Westphalia: a new generation of power plants, the first one in Datteln.

In this type of execution, it is necessary to reduce construction costs, fulfill the highest quality requirements, and always in the less time possible. Together with these objectives, high safety standards must be maintained, which is why real specialization in the work is required. In this manner, customized solutions adapted to the requirements of this construction project were offered.

During the first phase, approximately 30,000 m³ of concrete were used, with various formwork systems for building walls, columns and slabs for the engine room, boiler area, cooling tower and auxiliary buildings.

 

The supply scope was completed with 8,500 m² of ORMA formwork, 11,200 m² of slab formwork, 5,500 linear meters of T-60 Shoring System and 56,000 linear meters of timber beams. The quality of the material and its high performance, combined with the technical knowledge and the flexibility of the formwork, contributed towards the on time core construction, despite tight deadlines.

 

 

-      2

 
 
 