Welcome to ULMA´s web site

 
Link to ULMA home page

Project : Villaverde Alto Railroad Station

Villaverde Alto Railroad Station

MADRID, Spain

This project dealt with the construction of a pedestrian crosswalk to provide a provisional way to cross over railways, while connecting two residential zones.

 

 

The construction of the provisional pedestrian crosswalk joined two residential areas, providing the partial solution until the construction of a definitive crosswalk could be built.The crosswalk was assembled of BRIO Multidirectional Scaffolding at a height that made it possible to save the railway facility’s catenaries. Crosswalk access was provided via ramps, permitting its use by pedestrians with physical handicaps.

-      2

 
 
 

Other options

 

© 2010 ULMA Construcción

ULMA Worldwide