This project dealt with the construction of a pedestrian crosswalk to provide a provisional way to cross over railways, while connecting two residential zones.
The construction of the provisional pedestrian crosswalk joined two residential areas, providing the partial solution until the construction of a definitive crosswalk could be built.The crosswalk was assembled of BRIO Multidirectional Scaffolding at a height that made it possible to save the railway facility’s catenaries. Crosswalk access was provided via ramps, permitting its use by pedestrians with physical handicaps.